Customization: | Available |
---|---|
Certification: | CCC, RoHS, ISO, CE |
Hole: | with Hole |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
FRP cable tray consists of a vented or solid bottom contained within the longitudinal measurement, providing moderate ventilation, increased cable support frequency, and a bottom configuration that provides cable support every 4 inches. Available in metallic and non-metallic materials. Typically used for control and instrumentation cables in moderate heat applications, supporting spans of 5 feet to 12 feet. FRP cable tray bottoms are available in flat or corrugated styles and are 3 times stronger and 21 times stiffer than flat bottoms. Corrugated seams between seam sections eliminate the need for bottom seam splicing. Load Depth: 3 inches to 5-1/2 inches Available Materials: Aluminum, hot-dip galvanized steel, stainless steel, or glass.
1. Power industry, used for cable laying in power plants, substations and other places, supporting and protecting cables.
2. Petrochemical industry, used for cable laying and protection.
3. Rail transit, supporting and protecting signal, communication and power cables.
4. Construction industry, used for cable laying and management.
5. New energy field, used for cable laying in new energy projects such as wind farms and photovoltaic power stations, adapting to harsh outdoor environments.
6. Sewage treatment, used for cable laying in sewage treatment plants, corrosion-resistant and moisture-resistant.
7. Mining industry, used in coal mines, metal mines and other places, supporting and protecting power machine communication cables.
Product Name | Perforated Cable Tray |
Material | Steel/ Aluminum/ Stainless steel/ FRP |
Surface Finish | Pre Galvanized/ Hot-dip galvanized/ Powder Coated/ Enamel Paint |
Color | Default/ Customized according to customer requirements |
Thickness(mm) | 0.6-2.0 |
Length(mm) | 6000/ 3000 / 2000 / Customized according to customer requirements |
Width(mm) | 25-600/ Customized according to customer requirements |
OEM Service | Available |
1. Strong corrosion resistance, can resist corrosion from a variety of chemical substances, suitable for use in corrosive environments such as chemical and marine environments.
2. Lightweight, high strength, easy to transport and install, with high mechanical strength, can withstand large loads.
3. Good insulation performance, can effectively prevent current leakage, and ensure safe operation of the cable system.
4. High and low temperature resistance, adaptable to various climate conditions.
5. Good flame retardant performance, can effectively prevent the spread of fire when encountering fire, suitable for places with high fire protection requirements.
6. Long service life, reducing the frequency of maintenance and replacement.
7. Easy to install, saving time and cost, and FRP materials can be recycled and meet environmental protection requirements.
Hengrun is one of the earliest manufacturers of fiberglass composite materials in China, located in Hengshui City, Hebei Province, with a history of nearly 50 years. The company is led by technology and has 4 invention patents and 28 utility model patents. The company has successfully obtained ISO9001 quality management system certification, ISO14001 environmental management system certification, GB/T28001 occupational health and safety management system certification, and WRAS certification from the British Water Industry Association.
1. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. Or it is 10-15 days if the goods are not in stock, it is according to the quantity.